High Tunnel Going Up

With the assistance of Dr. Christine Coker and her crew, a new high tunnel is being constructed at the South Mississippi Research and Extension Center in Poplarville.  It is 24 ft by 60 ft long.  Right now it doesn’t have the plastic on it, as nothing is currently in it, the plastic isn’t really necessary.  I plan to put some plants in it probably in November.  My plan right now is to put in some Passiflora incarnata and possibly blackberries, depending on how much room I have and how many plants I can get my hands on.  See the photos below for an idea of what the high tunnel looks like during its construction.

High Tunnel from the end.

High Tunnel from the end.

High Tunnel side shot.

High Tunnel side shot.

Attendees of the Ornamental Field Day on October 4, 2012 will have a chance to take a look at the high tunnel and learn a bit about its purpose and construction.  More information on the Ornamental Field Day can be found here: http://deltafarmpress.com/orchard-crops/new-landscape-plants-be-presented-oct-4

 

Advertisements

One response

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s